Cadet The Com-Pak Bath Heater CB103T Anleitung zur Fehlerbehebung

Stöbern Sie online oder laden Sie Anleitung zur Fehlerbehebung nach Warmwasserbereiter & Kessel Cadet The Com-Pak Bath Heater CB103T herunter. Cadet The Com-Pak Bath Heater CB103T Troubleshooting guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 10
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
OWNER’S GUIDE FOR MULTI-VOLT MODELS
The Com-Pak™ Bath Heater
SAVE THESE INSTRUCTIONS
IMPORTANT INSTRUCTIONS
The Com-Pak™ Bath Heater
Primary and secondary thermal
safeguards
High temperature manual reset
Over temperature one-time thermal device
Commercial grade steel element - painted to
resist rusting
Built-in controls
- Single pole thermostat
- 60 minute timer
Powder coat paint process eliminates
sharp cutting edges
Three year extended warranty on
element and motor
Factory tested
Multi-Volt configurations
120 or 240 Volt AC (1000 Watts)
*Factory set at 240-Volts
Tools Required:
Phillips Screwdriver
Straight Screwdriver
Wire Strippers
Utility Knife
4 1
1
/2" Wood Screws
3 Insulated Wire Connectors
1 Strain Relief Connector
WARNING
Turn the electrical power off at the electrical panel
board (circuit breaker or fuse box) and lock or tag
the panel board door to prevent someone from
turning on power while you are working on the
heater. Failure to do so could result in serious
electrical shock, burns, or possible death.
1. Read all instructions before using this heater.
2. Read all information labels. Verify that the electrical
supply wires are the same voltage as the heater.
3. All electrical work and materials must comply with the
National Electric Code (NEC), the Occupational Safety and
Health Act (OSHA), and all state and local codes.
4. Connect the grounding pigtail (copper wire) provided in
the wall can to the supply ground wire.
5. If you need to install a new circuit or need additional
wiring information, consult a qualified electrician.
6. Protect electrical supply from kinks, sharp objects, oil,
grease, hot surfaces or chemicals.
7. WARNING
Overheating or fire may occur. DO NOT install the heater in
a floor, in the ceiling, below a towel bar, behind a door, or
anywhere the air discharge may be blocked in any manner.
8. WARNING
Fire or explosion may occur. DO NOT install heater in any
area where combustible vapors, gases, liquids, or
excessive lint or dust are present.
9. WARNING
DO NOT install where heater is likely to get wet.
10. WARNING
Heater must be connected to a GFCI protected branch circuit.
11. WARNING
Burn Hazard. This heater is hot when in use. To avoid burns,
do not let bare skin touch hot surfaces. Use extreme caution
when any heater is used by or near children or invalids.
12. WARNING
Risk of Electrical Shock. DO NOT install the heater directly
above bathtub or sink. DO NOT install in shower stall area
(Manufacturer recommends a minimum 2 foot clearance).
13. WARNING
Risk of Electrical Shock. Connect grounding lead
to grounding wire provided. Keep all foreign objects
out of heater.
14. WARNING
Risk of Electrical Shock. Never place a switch where it can
be reached from the tub or shower enclosure.
15. WARNING
Risk of Fire. Do not block heater. Heater must be kept clear
of all obstructions: a minimum of 3 feet in front, 6 inches
above and on both sides. Heaters must be kept clean of lint,
dirt and debris. (See Maintenance Instructions).
Models:
CBC103TW or CB103T The Com-Pak Bathroom Heater
360-693-2505 Fax: 360-694-8668 P.O. Box 1675 Vancouver, WA 98668-1675
Features & Benefits
1/2” Depth
10” Width
12 5/8” Height
Seitenansicht 0
1 2 3 4 5 6 7 8 9 10

Inhaltsverzeichnis

Seite 1 - The Com-Pak™ Bath Heater

OWNER’S GUIDE FOR MULTI-VOLT MODELSThe Com-Pak™ Bath HeaterSAVE THESE INSTRUCTIONSIMPORTANT INSTRUCTIONSThe Com-Pak™ Bath Heater Primary and secondar

Seite 2 - IMPORTANT!

GarantíaCONSULTE LOS CÓDIGOS ELÉCTRICOS LOCALES PARA DETERMINAR QUÉ TRABAJOS DEBEN SER REALIZADOS POR PERSONAL DE SERVICIO ELÉCTRICO CALIFICADO.Síntom

Seite 3 - Figure 8

Installation InstructionsHow do I install for new construction?Figure 1Face of wall can mustextend 1/2 or 5/8 inch fromface of stud to allow forthickn

Seite 4 - Figure 10

Installation InstructionsWARNINGTurn the electricalpower off at theelectrical panelboard (circuitbreaker or fusebox) and lock ortag the panel boarddoo

Seite 5 - IMPORTANT INSTRUCTIONS

Operation & MaintenanceHow to operate your heater1. Once installation is complete and power has been restored, turn thethermostat knob fully clock

Seite 6 - CONSERVE ESTAS INSTRUCCIONES

WarrantyCONSULT LOCAL ELECTRICAL CODES TO DETERMINE WHAT WORK MUST BE PERFORMED BY QUALIFIED ELECTRICAL SERVICE PERSONNEL.Symptom Problem SolutionBrea

Seite 7 - Figura 3

GUÍA DEL PROPIETARIO PARA MODELOS DE MULTIVOLTAJEThe Com-Pak™ Bath HeaterCONSERVE ESTAS INSTRUCCIONESINSTRUCCIONES IMPORTANTESThe Com-Pak Bath Heater

Seite 8 - Figura 8

Instrucciones para la instalación¿Cómo se instala el calentador en una construcción nueva?Figura 1La superficie de lacámara de pared debesobresalir de

Seite 9 - Figura 10

Instrucciones para la instalación¡ADVERTENCIA!Desconecte laelectricidad en eltablero del paneleléctrico (caja decortacircuitos ofusibles) y trabe ocol

Seite 10 - INSTRUCCIONES IMPORTANTES

Funcionamiento y mantenimientoCómo hacer funcionar el calentador 1. Una vez que se haya realizado la instalación y restablecido la energía eléctrica,g

Kommentare zu diesen Handbüchern

Keine Kommentare